If you look closely you can see a black border on the ground. This was the T wing (for temporary). It was built in November of 2000 and was only compromised of one building (T-1). Constructed during a time of “modernization,” (removing asbestos, changing to a modern HVAC system, lighting systems, and wheelchair access) whole wings had to be moved into a platoon of portable classrooms. Teachers would take turns using the building until their classroom was modernized. When modernization was finished, the building was taken down and shipped to another high school or middle school campus that was being modernized. T-1 contained a pebbled gray floor, lower-than-usual ceiling, dimmable lights, and lab peninsulas like you can find in Mr. Montbriand’s (D-8) chemistry classroom. The front of the classroom featured a long lab bench (demo table) and sliding whiteboards with plenty of storage behind them.